Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Chen, L, Manley, K, Lewis, J, Helfer, F and Widen, K (2018) Procurement and Governance Choices for Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 144(08).

Cho, C, Kim, K, Park, J and Cho, Y K (2018) Data-Driven Monitoring System for Preventing the Collapse of Scaffolding Structures. Journal of Construction Engineering and Management, 144(08).

Faghih, S A M and Kashani, H (2018) Forecasting Construction Material Prices Using Vector Error Correction Model. Journal of Construction Engineering and Management, 144(08).

Hosseini, M R, Maghrebi, M, Akbarnezhad, A, Martek, I and Arashpour, M (2018) Analysis of Citation Networks in Building Information Modeling Research. Journal of Construction Engineering and Management, 144(08).

Ji, W and AbouRizk, S M (2018) Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains. Journal of Construction Engineering and Management, 144(08).

  • Type: Journal Article
  • Keywords: Rework; Cost estimation and control; Data-driven simulation; Absorbing Markov chain; Pipe fabrication;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001534
  • Abstract:
    This paper aims to develop a novel, data-driven simulation model to quantitatively assist decision support systems in quality-induced rework cost estimation and control for construction product fabrication. At the core of the model is a specialized absorbing Markov chain, which stochastically models the construction product fabrication process while considering quality-induced rework uncertainty. The model parameters are dynamically updated using real-time quality management and cost management information to achieve more accurate and reliable simulation outputs. Furthermore, two types of decision-support metrics are developed to support rework cost management processes, namely (1) rework cost estimation during the project planning phase, and (2) rework cost control during the project execution phase. An illustrative example is provided to demonstrate the functionalities of the model and the implementation of the decision-support metrics. Finally, the proposed approach is integrated into the previously developed simulation-based analytics framework and implemented by an industrial pipe fabrication company in Edmonton, Canada. The presented case study demonstrates the applicability and feasibility of the proposed approach to industrial pipe welding processes.

Ji, W, AbouRizk, S M, Zaïane, O R and Li, Y (2018) Complexity Analysis Approach for Prefabricated Construction Products Using Uncertain Data Clustering. Journal of Construction Engineering and Management, 144(08).

Kim, K, Cho, Y and Kim, K (2018) BIM-Driven Automated Decision Support System for Safety Planning of Temporary Structures. Journal of Construction Engineering and Management, 144(08).

Lee, J (2018) Value Engineering for Defect Prevention on Building Façade. Journal of Construction Engineering and Management, 144(08).

Maemura, Y, Kim, E and Ozawa, K (2018) Root Causes of Recurring Contractual Conflicts in International Construction Projects: Five Case Studies from Vietnam. Journal of Construction Engineering and Management, 144(08).

Pomares, J C, González, A and Saura, P (2018) Simple and Resistant Construction Built with Concrete Voussoirs for Developing Countries. Journal of Construction Engineering and Management, 144(08).

Qian, Q and Zhang, L (2018) Impact of Regulatory Focus on Choice of Project-Governance Modes: Role of Tolerance of Opportunistic Behavior. Journal of Construction Engineering and Management, 144(08).

Siebelink, S, Voordijk, J T and Adriaanse, A (2018) Developing and Testing a Tool to Evaluate BIM Maturity: Sectoral Analysis in the Dutch Construction Industry. Journal of Construction Engineering and Management, 144(08).

Su, C T, Santoro, M C and Mendes, A B (2018) Constructive Heuristics for Project Scheduling Resource Availability Cost Problem with Tardiness. Journal of Construction Engineering and Management, 144(08).

Tabish, S Z S and Jha, K N (2018) Beyond the Iron Triangle in Public Construction Projects. Journal of Construction Engineering and Management, 144(08).

Techera, U, Hallowell, M, Littlejohn, R and Rajendran, S (2018) Measuring and Predicting Fatigue in Construction: Empirical Field Study. Journal of Construction Engineering and Management, 144(08).

Wang, X, Huang, X, Luo, Y, Pei, J and Xu, M (2018) Improving Workplace Hazard Identification Performance Using Data Mining. Journal of Construction Engineering and Management, 144(08).

Wu, W, Mayo, G, McCuen, T L, Issa, R R A and Smith, D K (2018) Building Information Modeling Body of Knowledge. I: Background, Framework, and Initial Development. Journal of Construction Engineering and Management, 144(08).

Wu, W, Mayo, G, McCuen, T L, Issa, R R A and Smith, D K (2018) Building Information Modeling Body of Knowledge. II: Consensus Building and Use Cases. Journal of Construction Engineering and Management, 144(08).

Zuluaga, C M, Albert, A and Arroyo, P (2018) Protecting Bridge Maintenance Workers from Falls: Evaluation and Selection of Compatible Fall Protection Supplementary Devices. Journal of Construction Engineering and Management, 144(08).